CRITICAL METALS
Manna Lithium Project, Goldfields, WA
Project Highlights:
• Outcropping spodumene bearing pegmatite;
• High grade individual pegmatite dykes +20m wide;
• 100% ownership acquired;
• Mineral Resource Estimate of 36Mt @ 1.13% Li2O2;
• Significant exploration upside with resource open at depth and to the NE and SW;
• 20-person exploration camp recently commissioned;
• +50,000m RC and diamond drilling program underway;
• The World’s best lithium mining jurisdiction – Au, Ni & Li;
• 100km East of Kalgoorlie – 13km N of Trans Australian Railway;
• Railway or road options from Kalgoorlie to Esperance Port or Kwinana Port.
• Outcropping spodumene bearing pegmatite;
• High grade individual pegmatite dykes +20m wide;
• 100% ownership acquired;
• Mineral Resource Estimate of 36Mt @ 1.13% Li2O2;
• Significant exploration upside with resource open at depth and to the NE and SW;
• 20-person exploration camp recently commissioned;
• +50,000m RC and diamond drilling program underway;
• The World’s best lithium mining jurisdiction – Au, Ni & Li;
• 100km East of Kalgoorlie – 13km N of Trans Australian Railway;
• Railway or road options from Kalgoorlie to Esperance Port or Kwinana Port.
Wyemandoo Rb/Li/Cs/W Project, WA
INVESTMENT HIGHLIGHTS:
• Leverage to international critical minerals;
• Actual on-ground activity moving towards resource drilling;
• Proven team with recent success;
• Diligent execution of exploration plan;
• Quality shareholders - long term & supportive track record;
• 100% Aldoro held project.
• Leverage to international critical minerals;
• Actual on-ground activity moving towards resource drilling;
• Proven team with recent success;
• Diligent execution of exploration plan;
• Quality shareholders - long term & supportive track record;
• 100% Aldoro held project.
Fuwan Silver Project, Guangzhou, China
Feasibility Study Highlights:
• Study: Completed by Wardrop, NERIN & ERM to International Standards;
• Reserve: Probable Mineral Reserve: 9.118 Mt averaging 189 g/t Ag;
• Mining: Decine access, Underground mechanized mining, Combination of cut & fill, drift & fill, room & pillar;
• Processing: 3,000 tpd, conventional floatation; Estimated 5.5 million oz pa; End products: silver/lead & zinc/silver concentrates; Metallurgical silver recovery of 91%.
• Study: Completed by Wardrop, NERIN & ERM to International Standards;
• Reserve: Probable Mineral Reserve: 9.118 Mt averaging 189 g/t Ag;
• Mining: Decine access, Underground mechanized mining, Combination of cut & fill, drift & fill, room & pillar;
• Processing: 3,000 tpd, conventional floatation; Estimated 5.5 million oz pa; End products: silver/lead & zinc/silver concentrates; Metallurgical silver recovery of 91%.
Boundiali Gold Project, Côte d'Ivoire
• Located in a prominent gold-producing region;
• Comprises four exploration tenements;
• Presence of significant artisanal mining operations;
• Gold mineralization found at the surface;
• JORC 2012 Mineral Resource Estimate of 1.59 million ounces of gold (December 2024);
• Experienced management and exploration team that successfully advanced Abujar from greenfields to a gold producer in just eight years;
• Excellent access to roads, services, and power infrastructure;
• Côte d'Ivoire benefits from stable political governance and robust economic performance.
• Comprises four exploration tenements;
• Presence of significant artisanal mining operations;
• Gold mineralization found at the surface;
• JORC 2012 Mineral Resource Estimate of 1.59 million ounces of gold (December 2024);
• Experienced management and exploration team that successfully advanced Abujar from greenfields to a gold producer in just eight years;
• Excellent access to roads, services, and power infrastructure;
• Côte d'Ivoire benefits from stable political governance and robust economic performance.
Rocklea Iron Ore Mine, Pilbara, WA
Asset Highlights:
• JORC2012 Resource of 182Mt;
• Near Term production potential;
• Initial production capacity of 2Mtpa, with a long-term goal of increasing to 5Mtpa;
• Currently holds 2 Exploration and 2 Retention licences;
• Application for a Mining Lease is underway.
• JORC2012 Resource of 182Mt;
• Near Term production potential;
• Initial production capacity of 2Mtpa, with a long-term goal of increasing to 5Mtpa;
• Currently holds 2 Exploration and 2 Retention licences;
• Application for a Mining Lease is underway.
Gwayi Coal-EIec Integ Project, Harere, ZW
Project Development Plan:
• The coal mine is located on the south side of the power plant.
• The coal mine has been granted a development right for 25 years.
• In the 67.2 km2 Phase 1 detailed exploration area, the reserves are 1.9 BT, with a high average calorific value of 5,100 kcal, allowing the plant to operate for 40 years.
• The project is planned as an open pit mine with 1.8Mtpa in the first phase and 5Mtpa in the vision.
• The coal mine is located on the south side of the power plant.
• The coal mine has been granted a development right for 25 years.
• In the 67.2 km2 Phase 1 detailed exploration area, the reserves are 1.9 BT, with a high average calorific value of 5,100 kcal, allowing the plant to operate for 40 years.
• The project is planned as an open pit mine with 1.8Mtpa in the first phase and 5Mtpa in the vision.
LEARN MORE
Mining Projects
If you are interested in publishing an exclusive project introduction to effectively connect with your target audience thru the right channel, please contact us for more information.